Al Muneera Al Raha Beach
项目资料
城市: 阿布扎比
国家: 阿拉伯联合酋长国
项目开始: 2009
项目竣工: 2011
物业类型: 住宅

 

STREAM 垃圾自动收集系统
系统类型: 重力真空输送系统
管道总长度: 2,000 米
管道段数: 2
每日产生垃圾总量: 8 公吨

 

Al Muneera, part of the Al Raha Beach Development was conceived by best architects in the world with every aspect of the environment being considered during the master plan phase. ALDAR, our client has a vision for Al Raha Beach to be the best development of its kind, with every “Green” building to have gained “Leadership in Energy and Environmental Design” (LEED) certification. The development features extensive use of recyclable materials and prefabricated elements. STREAM Automated Waste Collection System (AWCS) was installed to minimise waste creation and maximise waste separation in order to support the environmental friendly concept. Our system addressed all issues faced by the conventional waste handling method, such as leachate spillage (garbage juice) during handling, wreaking of odour, and the tendency for waste to enter the sensitive eco-systems.