Maju Tower & Maju Junction Shopping Mall
Project Information
City: Kuala Lumpur
Country: Malaysia
Project Startup: 2000
Project Completion: 2002
Sector: Commercial
Stream AWCS
Type of AWCS: Full Vacuum System
Total Pipe Length: 300m
Number of Fractions: 1
Estimated Waste per Day: 6 metric tons

 

Maju Junction required an innovative waste management solution to handle significant amount of general and organic waste generated from offices, retail outlets and catering facilities within the building. STREAM Full Vacuum System was installed with a key operated system that is able to handle both heavy and wet waste easily. The security key is used to activate the transport cycle. A computer controlled inner door opens to allow garbage to be sucked into the stainless steel transport pipes. Waste is then being compacted to increase the container capacity whilst reducing the frequency of emptying. The Central Waste Handling Facilities (CWHF) is a stand alone building located outside the main building, as specified by our client .